Wind Generation

11361.855 MW

Wind Installed Capacity

9331.365 MW

Wind Grid Connected State Transmission Utility

2030.49 MW

Central Transmission Utility

12,778 MU

Wind Generation


For STU Connections Application Process charges for wind (on time collection)

  • Evacuation Application Fee - 5 Lakhs/Application
  • Load Flow Study Charges - 1 Lakh upto 100MW & 1.5 Lakhs for above 100MW
  • Refundable security deposit for load flow study - 20 Lakhs/Application
  • WEG location registeration fee - 33300/Location
  • Consultancy Charges - 66600/Location
  • Non Refundable Infrastructure Development charges for connecting in TNPDCL,TANTRANSCO owner SS - 30 Lakhs/MW
  • Inspection,testing and commissioning charges - 10% estimate cost

Restructuring charges after commissioning of WEG (Every Month Collection)

  • Transmission Charges - 5580.26/MW/Day
  • Scheduling Charges - 200/Day
  • System operating charges - 92.46/MW/Day
  • Wheeling charges - 05. /Unit
  • O&M Charges - 3.017 Lakhs/MW

Wind Energy Passing Areas in Tamil Nadu

  • Aralvoimozhi Pass (Kanyakumari, Tirunelveli)
  • Kambam Pass (Theni, Dindigul)
  • Palghat Pass (Coimbatore)
  • Sengottah Pass (Tenkasi)
Save-energy1 குறைந்த ஆற்றலைப் பயன்படுத்துவதன் மூலம் இப்போதும் எதிர்காலத்திலும் பணத்தைச் சேமிக்கலாம்.  Save-energy2 மின்சார வாகனங்கள், தெளிவான வானத்திற்கு வழி வகுக்கின்றன.  Save-energy1 மின்சாரத்தை புத்திசாலித்தனமாகப் பயன்படுத்துங்கள், அது ஒரு மாயம் அல்ல, இது ஒரு வளம்.  Save-energy3 நட்சத்திர மதிப்பிடப்பட்ட உபகரணங்களைப் பயன்படுத்துவதன் மூலம் உங்கள் பில்களில் பணத்தை சேமிக்கவும்.   Save-energy4 மாற்றத்திற்கான வெற்றியாளராக இருங்கள் - சேமிக்கப்பட்ட ஒவ்வொரு வாட் ஒரு வித்தியாசத்தை ஏற்படுத்துகிறது 